10/10 at 18:30
Valmistuva uudisasunto Turun Telakkarannassa – 52,5 m² saunallinen kaksio, Turku
Sorela Oy sells
€21,100
Total price from €21,200
10/10 at 18:30
To highest bidder
Viewed 8,750 times
Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.
The construction of the detached house at Kerkkäkuja 3 was started in 2024. The building is located on its own 1,016 m² plot in a detailed plan area. The planned living area of the building is approximately 134 m², floor area approximately 146 m² and gross area approximately 296 m².
In accordance with the plans, the property comprises four rooms, an open-plan kitchen and living room, a bathroom, a sauna, a utility room and a separate WC. In addition, the building has a full basement, which includes storage and technical spaces, among other things. The house has modern building services suitable for contemporary living: geothermal heating (commissioned in March-April 2025), water-circulated underfloor heating and mechanical ventilation with heat recovery. The building has a timber frame and timber cladding, and the pitched roof has a standing seam metal covering.
Building permit valid
A building permit 24-0104-R has been granted for the property. According to the permit, construction work must be completed by 18 June 2029, unless the validity period of the permit is extended. There are still inspections relating to commissioning of the building and other measures required by the building supervision authority to be carried out.
Basic property details
Address: Kerkkäkuja 3, Raisio
Property ID: 680-13-1359-2
Plot: own, 1,016 m²
Plan: detailed plan, AO - block area for detached houses
Building type: detached house
Construction started: 2024
Living area: approx. 134 m²
Floor area: approx. 146 m²
Gross area: approx. 296 m²
Heating: geothermal heating and water-circulated underfloor heating
Ventilation: mechanical ventilation with heat recovery
The property offers an interesting opportunity especially for a buyer with construction knowledge, a building industry professional or someone looking for a project property who can assess the required repair and finishing works and wants to complete the house.
The property is sold unfinished. The property has not been lived in during the owners' period of ownership. In its current condition, the property is not yet suitable for habitation and the final inspection for commissioning has not been carried out.
The property is sold in the condition and completion stage it is in at the time of sale. Before submitting an offer, the buyer must carefully inspect the property and the related building and inspection documents, and assess the costs and risks associated with completing, repairing and carrying out any further investigations on the building. The buyer must take the above into account in their offer. The unfinished state of the building and the costs arising from completing construction cannot be invoked as a defect to the extent that the buyer could have observed them when inspecting the property. The buyer must note that not all completion-related needs may be apparent on a superficial inspection. The owners are aware that the insulation in the roof space is currently insufficient.
The property has a valid electricity contract and water connection. The water supply to the water points is currently shut off by the owners to prevent water damage. There are no known leaks or leakage- or freezing-related damage. The property has been heated, and no unusual energy consumption has been observed. According to the owners, the heating system is operating properly.
The seller reserves the right to accept or reject the highest bid.
The item is sold as a transaction between users. Huutokaupat.com does not act as a party to the transaction.
Auction and sale terms:
Sale of the property:
The auction and sale of the property are conducted, on behalf of the owners, by the court-appointed trustee appointed by the Southwest Finland District Court to dissolve the property’s joint ownership. The owners have the right to sell the property, which is sold free of all encumbrances.
The trustee and Heikkilä & Co HCO Attorneys-at-Law Ltd arrange the auction and presentation of the property. The trustee acts as the joint owners’ representative and seller at the auction. The trustee and Heikkilä & Co HCO Attorneys-at-Law Ltd are not responsible for the operation of the auction system.
There is no reserve price for the auction property. However, the trustee reserves the right to accept or reject the highest bid. The joint owners acting unanimously have the right to deviate from the trustee’s decision to accept or reject a bid. The trustee reserves the right to end the sale or extend the sale period.
The deed of sale will be signed by the trustee.
Conducting the auction:
The property is sold in a transaction between users. Huutokaupat.com is not a party to the transaction.
Bids must be submitted by the stated deadline. The highest bid is the bid that has been validly entered into the system by the deadline and when the auction closes.
You may also participate by submitting a written bid to Heikkilä & Co HCO Attorneys-at-Law Ltd, Puutarhakatu 45, 20100 Turku. The bid must arrive by the time the auction closes; bids received after this will not be processed. The bidder is responsible for ensuring that the bid arrives. Heikkilä & Co HCO Attorneys-at-Law Ltd undertakes to enter bids into the Huutokaupat.com system. A written purchase offer, which must include the bidder’s contact details, the maximum bid and the item number on the Huutokaupat.com service, is binding and subject to the same terms as an electronic auction.
Buyer’s responsibility:
The buyer assumes full responsibility after completion of the sale for all unfinished building work, completion of the building work, rectification of known defects and deficiencies, any necessary demolition and rebuilding work, and any necessary investigations, inspections, plans, permits and official procedures, as well as the resulting costs.
The buyer must be aware that the property may also have unfinished work, defects, deficiencies or repair needs that have not been identified or specified at the time of the sale. When making a bid and determining the purchase price, the buyer shall take into account any uncertainties relating to the unfinished condition of the property and its completion.
Inspection of the property:
Before making a bid, the bidder is required to inspect the property, documents and records concerned. The buyer may not subsequently rely on any matter that could have been observed during the prior inspection.
A viewing will be held at the property on Monday 28 September 2026 from 17:00 to 18:00. The personal attendance of the bidder or the bidder’s representative at the viewing is an absolute condition for submitting a bid at the auction. Any bid that does not meet this condition will be rejected.
You must register for the viewing by 25 September 2026 at the latest by emailing: meeri.vihersaari@heikkilaco.fi. No other viewings of the property will be arranged.
Independent access to the property is strictly prohibited, as the property is private and equipped with alarm and camera surveillance. The cost of an unnecessary alarm call-out will be charged to any person found on the property without permission.
Information provided about the property:
The trustee confirms that the buyer has been given all information known to the seller that may reasonably be expected to affect the transaction.
Possible further investigations:
The buyer may, at their own expense and with the trustee’s prior consent, commission surveys and investigations of the property. Following any structural openings or investigations, the structure and property must, at the commissioner’s expense, be restored to the condition in which they were before the work.
Utility connections
The electricity and water connections belonging to the property will transfer to the buyer on completion without separate compensation, provided that the connection agreements and their terms permit transfer. After completion, the buyer is responsible for charges, agreements and any transfer costs relating to the connections. The network operator for the property’s electricity connection is Caruna Oy and the water connection provider is Raision Vesi Oy. Before completion, the buyer must verify the information concerning the connections, their transferability and the contractual terms directly with the relevant companies.
Movable property
The sale includes buildings, structures, equipment and machinery permanently located on the property and serving its intended use. It therefore also includes all built-in fixtures intended for the property, whether already attached or still detached. No other movable property is included in the sale.
Completion of the sale:
The sale of the property must be completed in the form prescribed by the Code of Real Estate. The time and place for signing the deed of sale will be agreed separately with the buyer. The purchase price is paid at the completion meeting. The fee of the public purchase witness will be paid equally by the trustee on behalf of the sellers and the buyer(s).
Other costs:
The buyer is responsible for transfer tax in accordance with the tax rules in force at the relevant time.
Withdrawal from the sale:
Bids made at the auction are binding. If a bid is accepted, the bidder is obliged to pay the offered purchase price within the stated payment period.
Under the Code of Real Estate, a party who refuses to complete the sale must reimburse the other party for reasonable costs incurred in advertising, inspecting the property and carrying out other necessary measures related to completing the sale.
Turku, 4 September 2026 (notice updated on 8 October 2026)
As the trustee appointed by the Southwest Finland District Court
Jukka Harno, Master of Laws, licensed trial counsel
No bids
Starting price €90,000
No deductible VAT
or create an account to bid.
Auction ends Fri, 09/10/2026 at 18:45, or 2 min after the last bid
Item number: 6559328
Viewed 8,750 times