02/09 at 13:00
Realisoidaan ulosmitattu omakotitalo Kuopion Kurkimäessä / Utmätt egnahemshus i Kurkimäki, Kuopio
Ulosottolaitos, Pohjois-Savon toimipaikat sells
€7,150
126 bids
02/09 at 13:00
5,0
Rena Homes Oy sells
Seller's other listingsViewed 92 times
Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.
Excellent investment one-bedroom apartment in Jyväskylä – strong cash flow and high return!
This property offers a very good return in a well-maintained housing company. It also works well for owner-occupation as a compact home in a great location.
For sale: a well-maintained apartment in a block of flats at Salokatu 20b. The housing company, completed in 1988, is neat and well cared for. The apartment has 42 m² of living space, and the layout is efficient and easy to let.
The apartment is currently rented, making this an excellent option for an investor who values a ready-made and hassle-free investment. The apartment has a neat laminate floor and clean light-coloured walls. The kitchen has been renovated, and there is a balcony and a washing machine connection, so the overall package meets current tenant expectations well.
Its location in Kypärämäki, Jyväskylä, offers smooth transport connections and good everyday services within a reasonable distance. The area is in demand on the rental market and is ideally suited for long-term letting.
Rent + water: 580.86 €/month
Maintenance charge + water: 138.60 €/month
Cash flow: approx. + 442.26 €/month
High rental yield!
BOARD'S REPORT ON MAINTENANCE NEEDS FOR 2025-2029
As the board's written report under the Housing Companies Act on the maintenance needs of the company's buildings and property
over the next five years, we present the following estimated maintenance works, which may materially affect
the use of the flat or the costs arising from it.
The following roof maintenance repairs will be carried out at the previous owner's expense during spring-summer 2025:
Sealing of penetrations (sealing around sewer vent pipes and negative pressure ventilators)
Safety chains for roof hatches, canopies for safety switches
Re-fixing of opened bitumen seams where necessary
Removal of moss from the roof edge
Other estimated maintenance needs 2025-2029
Maintenance repairs to windows and balcony doors where necessary (maintenance painting, adjustment of operation and inspection/replacement of seals if needed)
Coating of the roof with a waterproof and flexible elastomer coating, e.g. Cool Roof (a more affordable solution than replacing the felt)
Renewal of façade element joints
Replacement of shut-off valves for the kitchen tap and installation of drip trays at the bottom of the kitchen sink cabinets
Patching and maintenance painting of balcony concrete structures
Cleaning and adjustment of ventilation ducts
Pressure test of the civil defence shelter
BOARD'S REPORT ON MAINTENANCE AND ALTERATION WORK CARRIED OUT IN PREVIOUS YEARS
The following major renovation, maintenance and alteration works have previously been carried out in the company's buildings:
District heating centre renewed in 2013
Apartment renovations as needed when tenants changed
Civil defence shelter inspection and leak-tightness test in 2010
Ventilation ducts cleaned and air volumes adjusted every 10 years
+ maintenance work according to the service book
Contact us!
The seller undertakes to sell the item to the highest bidder.
The item is sold as a transaction between users. Huutokaupat.com does not act as a party to the transaction.
Bids start from the sale price upwards.
After the bid has been accepted, the highest bidder must pay a deposit of 4% of the sale price within two (2) days.
Offers must be submitted by the given deadline. The highest offer is the offer accepted as the highest by the seller. It is also possible to participate in the auction in person by submitting an offer to the seller on site. The seller and buyer undertake to record all offers in the system. By making an offer, the bidder accepts these terms of sale when placing the bid.
Viewing the property
Before making an offer, the bidder is obliged to inspect the apartment in question and the company's documents and records. The buyer may not later invoke any matter that could have been discovered during the pre-inspection.
Information provided by the seller
The seller is responsible for the accuracy and up-to-dateness of the documents related to the property. The seller confirms that they have provided the buyer with all information known to the seller and reasonably assumed to affect the sale.
Conclusion of the sale
The time and place for signing the deed of sale will be agreed separately with the buyer. Payment of the purchase price and transfer of shares take place at the closing meeting.
Other costs
The buyer is responsible for transfer tax in accordance with the tax practice in force at the time.
Withdrawal from the sale
If the sale is not completed for a reason attributable to the bidder, the seller is entitled to the agreed standard compensation (4% of the sale price).
5,0
Item number: 6517829
Viewed 92 times
5,0