13/06 at 18:20
Ari Suoniemi Oy sells
189 m² OFFICE AT HERMIA — FOR THE HIGHEST BIDDER, Tampere
Viewed 229 times
For Sale
Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.
Well-maintained property company with 11 buildings.
The company holds two leasehold plots from the City of Tampere and comprises 52 retail/office/workshop and storage units, totalling 22,387 m².
The unit is a bright and tidy office on the 2nd floor.
Basic information
KOy Hermia, Hermiankatu 6–8 B, 33720 Tampere (Hervanta/Hermia)
Area: 189 m² (office) + corridor, total area according to the articles of association 204 m²
Use: office
Shares: 11,597–11,813 (217 pcs)
Service charge: €5.02/m²/month (204 m²) = €1,024/month + VAT
Property management: Technopolis Oy
About the company
Mutual real estate company, parent company Technopolis Oy (71.96%)
Buildings 1988, precast concrete, district heating, mechanical ventilation with heat recovery (HRV)
Planned investments
2026: €359,000 (domestic water pipes, lift, ventilation, etc.)
2027–2035: approx. €320,000–€385,000 per year
Terms of Sale
The seller undertakes to sell the item to the highest bidder.
The item is sold as a transaction between users. Huutokaupat.com does not act as a party to the transaction.
Offers must be submitted by the stated deadline. The highest bid is the bid that the seller has accepted as highest. It is also possible to participate in the auction in person by submitting a bid to the seller on site. The seller and buyer agree to record all bids in the system. The bidder accepts these terms of sale when placing a bid.
Inspection of the property
Before making an offer, the bidder is obliged to inspect the share apartment, documents and other papers. The buyer cannot afterwards rely on a matter that could have been discovered during the pre-inspection.
Information provided by the seller
The seller warrants that they have provided the buyer with all information known to the seller that may reasonably be assumed to affect the transaction.
Conclusion of the sale
The time and place for signing the deed will be agreed separately with the buyer. Payment of the purchase price takes place at the signing of the contract.
Other costs
The buyer is responsible for the transfer tax according to the applicable tax practice.
Withdrawal from the sale
A party that refuses to complete the sale must, under the Land Code, compensate the other party for reasonable costs incurred from advertising, inspecting the share apartment and other necessary actions related to concluding the sale.
Files
- Isännöitsijäntodistus, Ari Suoniemi Oy, B3_30, 14.4.2026.pdf (requires login)
Ari Suoniemi Oy, item's publisher
Auction and Bidding
Time left
Bids
- Bids
- 0 pcs
- Bidders
- 0 pcs
Item number: 6347035
Viewed 229 times
Entry details
Inquiries
Viewing the item
Open viewings: 12 June 12:00–12:45, and 17 June 12:00–12:45. Other times by appointment.
Payment method
Payment method is agreed separately with the seller.
Last updated
10 Jun 2026, 12:41