07/08 at 18:40
To highest bidder
Kaluste-Kaksoset sells
Seller's other listingsViewed 130 times
Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.
Offered at auction: a 650 m² hall building in the busy Seppälänkangas industrial/commercial area.
Commissioned in 2003
5 metres high
2 large sectional doors (one electrically operated)
District heating
Underfloor heating
Parmaco prefabricated element hall. 650 m² LED lighting.
Property maintenance costs approx. €1 per m²/month
Own plot
Asphalted yard
The seller undertakes to sell the item to the highest bidder.
The item is sold as a transaction between users. Huutokaupat.com does not act as a party to the transaction.
Bids must be made by the stated deadline. The highest bid is the bid the seller has accepted as the highest.
The bidder accepts these terms of sale when placing their bid.
Inspection of the property
The bidder is obliged, before making an offer, to familiarise themselves with the property, documents and records. The buyer cannot subsequently rely on any matter that could have been observed during the preliminary inspection.
Information provided by the seller
The seller warrants that they have given the buyer all information the seller knows and which can be expected to affect the sale.
Conclusion of the sale
The sale of the property must be made in the form prescribed by the Land Code. The time and place for signing the deed of sale will be agreed with the buyer separately. The purchase price is paid at the closing. The fee for the certifying official is paid half by the seller and half by the buyer.
Other costs
The buyer is responsible for the transfer tax according to current tax practice.
Withdrawal from the sale
A party who refuses to conclude the sale must, under the Land Code, compensate the other party for reasonable costs incurred from advertising, property inspection and other necessary actions related to the transaction.
If the bidder withdraws from an accepted bid, they must compensate the seller for the costs of organising the failed auction: 4% of the debt-free purchase price or at least €2,000, or, if the seller accepts the next highest bid, the difference between the bids if it is greater than €1,000.
Item number: 6453961
Viewed 130 times