21/07 at 11:00
Kiinteistön määräosa / paritalohuoneisto Espoon Kurttilassa, Espoo
Ulosottolaitos, Länsi-Uudenmaan toimipaikat sells
€317,000
77 bids
21/07 at 11:00
Elomaa & Kovanen Oy sells
Seller's other listingsViewed 179 times
Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.
Corner through-apartment with a glazed balcony on the first floor (not at ground level). Glazed balcony. The building has a sauna. The housing company owns its plot (1,517 m²). Heating system: district heating. Available immediately after closing.
Water fee €31.00 per person/month, parking space €5.00/month. Sauna fee €7/month, family sauna €14/month. Washing machine fee €2 per wash. Company and financing charges are determined according to the number of shares.
Kitchen description:
Fridge-freezer, electric hob, extractor hood, cupboards, fixed light fittings.
Bathroom description:
Bathroom, separate WC, shower, bathtub, mirrors, washing machine connection, fixed light fittings.
Storage description:
Walk-in wardrobe
Housing company Asunto Oy Matinpuisto, property manager Alpo Leppäaho, maintenance: maintenance company.
Communal laundry, mangle, sports equipment storage, hobby room, shelter, communal antenna system
Garages or hall spaces 5 pcs, parking spaces with electric sockets 6 pcs
Renovations carried out
1997 Tiling of the sauna area and flashing of the chimney.
2001 Replacement of locks.
2004 Windows replaced.
2006 Garage doors replaced.
2006 Sauna room panelling.
2008 Stairwell painting and connection to district heating.
2009 Oil tanks removed and the freed space refurbished for storage use.
2011 Replacement of balcony doors and windows and cellar windows, and renovation of the bicycle storage door and entrance.
2012 Cleaning, maintenance and adjustment of the ventilation ductwork.
2014 Renovation of the external envelope, covering of the third-floor balconies and balcony roofs with a canopy.
2014 Surface renovation of the balconies.
2014 Replacement of the main water pipe and earthing.
2016 Replacement of stairwell external doors.
2018 Renovation of the garage exterior surfaces.
2023 Inspection of the metal roof and repair and maintenance painting.
Upcoming renovations
Decided: The housing company is planning a sewer renovation, the costs of which will be shared among shareholders. Planned: Board review of maintenance needs for 2025–2029:
Renovation and painting of the basement level.
Property condition assessment.
Condition inspections of the water, sewage and heating systems and repairs as necessary.
Renovation of the structures in front of the garage doors.
Services: Grocery store 200 m, post office 350 m, library 300 m, health centre in Äänekoski 9 km. Schools: Telakkakatu school, swimming pool and ice rink 1.5 km. Daycare: 350 m.
The seller undertakes to sell the item to the highest bidder.
The item is sold as a transaction between users. Huutokaupat.com does not act as a party to the transaction.
Bids start from the sale price upwards.
The buyer of the apartment assumes responsibility for the apartment's debt share of 10 027,95 €.
After the bid has been accepted, the highest bidder must pay a deposit of 1 000 € within two (2) days.
Offers must be submitted by the given deadline. The highest offer is the offer the seller has accepted as highest. The seller and buyer undertake to record all offers in the system. The bidder accepts these terms of sale when placing their bid.
Viewing the property
The bidder is obliged, before making an offer, to inspect the apartment and the company's documents and records. The buyer cannot later refer to a matter that could have been observed during the preliminary inspection.
Information provided by the seller
The seller is responsible for the accuracy and timeliness of documents related to the property. The seller warrants that they have given the buyer all information the seller knows and which can reasonably be expected to affect the sale.
Conclusion of the sale
The time and place for signing the deed of sale will be agreed separately with the buyer. Payment of the purchase price and transfer of shares take place at the closing.
Other costs
The buyer is responsible for the transfer tax in accordance with the applicable tax practice.
Withdrawal from the sale
If the sale does not go through due to the bidder's fault, the seller is entitled to the agreed fixed compensation.
Item number: 6421207
Viewed 179 times