3,4

Hilma-Team Oy lists, Huutokaupat.com sells

Seller's other listings

🎶 2-DIN 7" MP5 car stereo with touch screen, Hämeenlinna

Viewed 50 times

1 / 13Sold to highest bidder

For Sale

Please note that this is an automatic translation. In case of any discrepancies between the original and this translated version, the original version shall prevail.

🎶 2-DIN 7" MP5 car stereo with touch screen

Mirror Link, Bluetooth, FM, USB & much more!

A versatile and affordable solution for your car's entertainment and connectivity functions!
The modern 7” full-touch screen combines entertainment, phone connectivity and a wide range of playback options in an easy-to-use package.


🔹 Key features:

  • 📱 7" full-touch screen – Easy to use and clear interface

  • 🔗 Mirror Link (Android) – Mirror your phone's screen directly to the car display via USB cable (use the original cable)

  • 🎧 Bluetooth 2.0 – Wireless music playback and hands-free calls

  • 📹 DVR support – Connect a USB camera and record your drives (camera not included)

  • 📻 FM radio – 18 preset channels (frequency range 87.5–108 MHz)

  • 🎶 File format support – MP3, WMA, APE, FLAC, WAV etc.

  • 🔌 USB, SD and AUX inputs – Multiple playback options

  • 🔊 4 x RCA outputs – Connect external amplifiers or speakers


🎵 Sound & Playback:

  • Adjustable bass, treble, balance and fader

  • Multiple equaliser options: Jazz, Rock, Pop, Classical etc.

  • ID3 tag support

  • Resume playback after interruption


🔧 User convenience:

  • Remote control included (CR2025 battery not included)

  • Supports steering wheel buttons (requires a compatible car)

  • Rotary volume control

  • Clock display and clear menu structure


🌍 Language support:
English, German, French, Spanish, Portuguese, Russian, Italian, Turkish, Arabic, Hebrew, Japanese, Chinese, Polish and several others.


⚙️ Technical specifications:

  • Power supply: 12 V (11–16 V operating range)

  • Power: 4x60 W (for speaker outputs)

  • Supported formats: BT / APE / WAV / WMA / MP3 / FM


🚘 Upgrade your car's multimedia system easily!

All this in one go – to the highest bidder!


The perfect solution for a modern driving experience – connect, listen and enjoy! 🚗🎶


Collection possible. By asking by email at myynti@hilmateam.fi or WhatsApp +3585061337, you will receive the collection point address and other necessary information.


The item has a 14-day right of cancellation for private individuals in accordance with consumer protection law.


Terms of Sale

The seller undertakes to sell the item to the highest bidder.

The seller of this item is Huutokaupat.com. The advertiser provides additional information about the item on behalf of Huutokaupat.com and is responsible for handover of the item. The item must always be paid for through the online payment buttons on the Huutokaupat.com website or by invoice from Huutokaupat.com. If the item is not paid to Huutokaupat.com, Huutokaupat.com accepts no liability for the transaction.


Please familiarise yourself with the auction terms for Huutokaupat.com sales and the terms of sale applicable to this auction before placing a bid.


Also note that

  • participating in the auction without an intention to buy is prohibited
  • you must review the item and the information provided about it before bidding (items are sold to non-consumers on an as-is basis)
  • the condition, service life and upgrade possibilities of used items generally do not correspond to those of new goods - you can find more information here
  • the item must be paid for within one (1) business day of the bid being accepted.

If needed, you can ask the advertiser for more detailed information about the item and matters related to its sale. For other matters, you can contact Huutokaupat.com's customer service. Consumer transactions include the right of cancellation under consumer protection law, the terms and limitations of which are set out in the terms of sale.

Hilma-Team Oy, item's publisher

3,4

60 items right now
12,349 sold items since August 2019
100% of winning bids approved

Auction and Bidding

5
Days
16
Hours
0
Minutes
56
Seconds

No bids

Starting price €20

Processing fee 2 € will be added to the price

Delivery method

or create an account to bid.

Auction ends Mon, 28/09/2026 at 15:34, or 3 min after the last bid

Bids

Bids
0 pcs
Bidders
0 pcs
Loading...

Item number: 6562211

Viewed 50 times

Entry details

Item location

13210 Hämeenlinna

Open map

Inquiries

Viewing the item

By agreement 050-61337

Payment method

Online bank payment, payment is due 24 hours after bid acceptance.

Last updated

20 Sept 2026, 07:46

Share with friends

Hilma-Team Oy, item's publisher

3,4

60 items right now
12,349 sold items since August 2019
100% of winning bids approved

Others also viewed

You might also like these

27/09 at 18:05

Vuotoallas, Inkoo

Turbo Oy lists, Huutokaupat.com sells

€50

Starting price

27/09 at 18:05

To highest bidder